The electricity connection should be residential or domestic under your local DISCOM.
PM Surya Ghar solar subsidy help in Aurangabad.
Eligible residential customers in Aurangabad / Chhatrapati Sambhajinagar (CSN) can apply for rooftop solar subsidy through the official National Portal. SolarWalaa can help you understand the steps before you start.
Last checked: 3 September 2026
Subsidy is mainly for residential rooftop solar.
The scheme is called PM Surya Ghar: Muft Bijli Yojana. The central subsidy is released after portal application, installation, inspection, and commissioning.
- Apply only through the official portal: pmsuryaghar.gov.in.
- Use a vendor listed on the portal for your DISCOM area.
- Subsidy is paid by DBT to the customer after approval.
Current central subsidy for residential rooftop solar.
The final portal calculation depends on your system, category, DISCOM approval, and the latest government rules. These are the common central CFA figures for regular residential systems.
| Rooftop system | Central subsidy | Simple meaning |
|---|---|---|
| 1 kW | Rs 30,000 | Useful for small homes with lower monthly electricity use. |
| 2 kW | Rs 60,000 | A common choice for homes with moderate bill usage. |
| 3 kW | Rs 78,000 | Often suitable when monthly usage is around 300 units or more. |
| Above 3 kW | Rs 78,000 cap | You can install a bigger system, but central subsidy is capped at 3 kW. |
| Group housing or RWA common facility | Rs 18,000 per kW up to 500 kW | For common loads as per portal and scheme conditions. |
Eligibility points to check before applying.
The portal and DISCOM decide final eligibility. These points help you prepare before starting the application.
The roof, terrace, balcony, or elevated structure should have usable sunlight and safe access.
You need electricity bill details, mobile number, bank account details, and documents asked by the portal.
Regular commercial bills and B2B product purchases are separate from this residential subsidy flow.
How customers normally get the subsidy.
Register On Portal
Enter state, DISCOM, consumer number, mobile, and other details on the National Portal.
Choose Vendor
Select a portal-listed vendor, check roof space, and discuss system size and quotation.
Get Approval
DISCOM feasibility, installation, net meter, and inspection are completed as per local process.
Receive DBT
After commissioning and approval, subsidy is credited to the eligible customer's bank account.
Choose kW size based on bill units, not guesswork.
In many Indian cities, 1 kW rooftop solar can generate roughly 4 to 5 units on a good sunny day. A 3 kW system can often cross 300 units in a month when shade and direction are good.
| Monthly use | Suggested start point | Approx generation |
|---|---|---|
| 100-150 units | 1 kW | About 90-150 units/month |
| 200-300 units | 2 kW | About 180-300 units/month |
| 300-450 units | 3 kW | About 270-450 units/month |
This is only a planning guide. Final design depends on roof shade, direction, sanction load, DISCOM rules, and budget.
kW size affects units
- Latest electricity bill with consumer number.
- Mobile number used for portal registration and OTP.
- Bank account details for subsidy transfer.
- Address and ownership/NOC details if required by DISCOM or society.
- Photos or site details requested during vendor and DISCOM steps.
"Do not start final installation before checking the portal process and DISCOM approval path."Simple subsidy advice from SolarWalaa.